# Ventilation optimization for the Middle East.

MENA buildings carry some of the world's highest HVAC loads. Poppy's measurement-first approach reduces ventilation waste and verifies savings in extreme climate conditions.

50M+

sq ft optimized globally

3

continents of deployment

18+

patents in ventilation measurement

## Why MENA

### Extreme conditions demand verified performance.

### Extreme climate, extreme HVAC load

MENA buildings face some of the world's highest cooling demands. Outdoor air conditioning represents a disproportionate share of energy spend — making over-ventilation unusually costly.

### High occupancy, high stakes

Premium commercial, hospitality, and healthcare buildings in MENA operate at high standards. Poppy's measurement approach confirms clean air delivery in the spaces where it matters most.

### Real verification for green building goals

MENA buildings increasingly target LEED, WELL, and Estidama. Poppy's verified savings and ventilation documentation supports certification and ESG reporting.

### Proven regional experience

Poppy has tested and optimized buildings across the UAE, Saudi Arabia, and broader MENA — understanding local building typologies, BMS configurations, and operational contexts.

## Where we operate

### Across the Gulf and beyond.

United Arab Emirates  
Saudi Arabia  
Qatar  
Kuwait  
Bahrain  
Oman

## Ready to measure your building?

Our MENA team can assess your building's ventilation performance and quantify the savings opportunity — with no upfront cost for qualifying buildings.
